# Booth production timeline

> A step-by-step timeline for planning an exhibition booth in Saudi Arabia, from the brief and design to organizer approval, production, build-up and dismantling.

Source: https://bilievent.com/guides/booth-production-timeline/ · bilievent · 2026-11-11

## Work backwards from the deadlines that do not move

The opening day is fixed, and so are the organizer’s deadlines in the exhibitor manual: stand design approval, service orders, contractor registration and the build-up window. Put those in the calendar first.

## A typical sequence for a custom stand

| When (before the show) | What happens | 
| 10–12 weeks | Book the space. Share the exhibitor manual and floor plan. Brief your contractor. | 
| 8–10 weeks | Concept and 3D. First quote. | 
| 6–8 weeks | Design revisions and sign-off. Order organizer services (power, rigging, furniture). | 
| 5–6 weeks | Technical drawings submitted for the organizer’s stand approval. | 
| 2–5 weeks | Production: structure, finishes, graphics, electrical, screens. Content for screens. | 
| Build-up days | Installation, testing, cleaning, handover. | 
| Show days | Crew on call for fixes and changes. | 
| Breakdown | Dismantling inside the organizer’s window. | 

Our planning guide for a custom stand. Large, double-deck or heavily technical stands need longer; small modular stands can be much faster.

## When time is short

- Choose a modular or hybrid structure

- Keep one hero feature instead of several

- Decide fast: most delays are waiting for approvals inside your own team

- Send the exhibitor manual on day one

Very short build windows, such as an overnight build in a hotel ballroom, are only realistic when the stand is designed for fast installation from the start.

## Signs you are late

- The organizer’s stand approval deadline is less than a month away and there is no design

- Service order early-bird dates have passed

- Your stand number is confirmed but nobody has the floor plan

Late is still possible. [Send the brief](/request/booth-proposal/) and we tell you honestly what can be done in the time left. Upcoming shows are in the [Saudi exhibitions calendar](/saudi-exhibitions-calendar/). Building for a show in Riyadh or Jeddah? See our [exhibition stand builder in Riyadh](/exhibition-stand-builder-riyadh/) and [exhibition stand builder in Jeddah](/exhibition-stand-builder-jeddah/) pages. For the design and build stages, see our [booth design in Riyadh](/booth-design-riyadh/) and [booth fabrication in Saudi Arabia](/booth-fabrication-saudi-arabia/) pages.