# Booth handover before opening: inspection checklist

> Accept your exhibition stand properly: what to check on structure, graphics, power and AV before opening, a snag-list template, and who fixes what.

Source: https://bilievent.com/guides/exhibition-booth-handover-inspection/ · bilievent · 2026-11-11

**In short:** booth handover is the walk-through where the exhibitor accepts the stand from the contractor before the show opens. Do it with the approved drawings in hand, enough time to fix what you find, and a written snag list that names who fixes each item and by when. Electrical and structural safety are checked by the qualified people responsible for them, not signed off by the marketing team.

This checklist is for exhibitors and their booth contractors at exhibitions in Saudi Arabia. Organizer manuals differ, so add the organizer’s own handover and inspection steps to it.

## 1. Book the handover

- Agree the handover time with the contractor in advance, early enough to fix snags before opening. The last hour before doors open is too late.

- Decide who attends: the exhibitor’s decision-maker, the contractor’s site lead, and the AV technician if there are screens or sound.

- Bring the approved drawings, the graphics approval sheet and the list of furniture and equipment ordered.

## 2. Structure and finish

- Layout matches the approved drawing: dimensions, open sides, storage room, counter positions.

- Walls, panels and ceilings look stable and finished: no gaps, raw edges, loose panels or visible fixings in customer areas.

- Flooring is flat and secured, with no trip edges at the stand boundary or between levels.

- Doors, locks and storage shelves work; you have the keys.

- Any questions about structural stability or loading are raised with the contractor and, where the organizer requires it, its approved inspector.

## 3. Graphics

- Every panel is installed in the right place, the right way up, with the approved version.

- No bubbles, creases, seams across faces or text, or visible damage.

- Arabic text reads correctly as installed; QR codes scan from where visitors will stand.

- Lightboxes are evenly lit.

## 4. Power, lighting and AV

Do not open panels or test electrical installations yourself. Ask the contractor and the AV technician to show you, in operation:

- all lights on, including lightboxes and accent lights;

- screens on with the approved content, the right resolution and the playback loop working;

- sound at a level the organizer allows, and microphones if ordered;

- power sockets where you asked for them, for laptops, chargers and demo equipment;

- how power is switched on and off each day, and who to call if it fails.

Electrical connections, loads and safety approvals are the responsibility of the contractor and the organizer’s or venue’s electrical team. If something looks unsafe (hot cables, exposed wiring, overloaded extensions), stop and report it to them.

## 5. Furniture, equipment and housekeeping

- Furniture, fridges, coffee machines and literature racks as ordered, undamaged and in position.

- Waste and packaging removed from the stand and storage.

- Fire extinguisher or other safety equipment in place if the organizer’s manual requires it on stands.

- The stand sign with your company name is installed. At trade exhibitions, SCEGA’s rules require a sign naming the participating entity on every stand; the organizer sets the format.

## 6. The snag list

Write every issue down, even small ones, and agree a fix time on the spot. A simple log:

| No. | Location / panel ref. | Issue | Photo | Owner | Fix by (time) | Closed (initials) | 
| 1 | | | | | | | 
| 2 | | | | | | | 
| 3 | | | | | | | 

Sign the handover only when the snags that affect opening are closed, or when the open items and their deadlines are written on the handover note. Keep a copy with photos.

## Who is responsible for what

| Area | Exhibitor | Booth contractor | AV supplier | Organizer / venue | 
| Layout and finish against drawings | Checks and accepts | Builds and fixes | — | Applies build rules | 
| Graphics | Checks content | Installs and fixes | — | — | 
| Electrical installation and safety | Reports concerns | Installs per rules | Own equipment | Inspects and connects, per manual | 
| Screens, sound, content playback | Supplies approved content | Coordinates | Installs and tests | Sound limits | 
| Snag list | Records and signs | Closes items | Closes AV items | — | 

## How bilievent can help

We build exhibition booths and deliver event AV production in Saudi Arabia, and can walk you through handover with a written snag list. See [booth design and production](https://bilievent.com/booth-production/), [AV and lighting production](https://bilievent.com/avl-production/), or [request a booth proposal](https://bilievent.com/request/booth-proposal/). For shows in Riyadh or Jeddah, see our [exhibition stand builder in Riyadh](https://bilievent.com/exhibition-stand-builder-riyadh/) and [exhibition stand builder in Jeddah](https://bilievent.com/exhibition-stand-builder-jeddah/) pages. For the design and build stages, see our [booth design in Riyadh](https://bilievent.com/booth-design-riyadh/) and [booth fabrication in Saudi Arabia](https://bilievent.com/booth-fabrication-saudi-arabia/) pages.